Skip to content

Decision making Quote by Eliyahu M. Goldratt

Download Open image
““STEP 1. Identify the system’s bottlenecks. (After all it wasn’t too difficult to identify the oven and the NCX10 as the bottlenecks of the plant.) STEP 2. Decide how to exploit the bottlenecks. (That was fun. Realizing that those machines should not take a lunch break, etc.) STEP 3. Subordinate everything else to the above decision. (Making sure that everything marches to the tune of the constraints. The red and green tags.) STEP 4. Elevate the system’s bottlenecks. (Bringing back the old Zmegma, switching back to old, less “effective” routings. . . .) STEP 5. If, in a previous step, a bottleneck has been broken go back to step 1.””

Eliyahu M. Goldratt

2.4 out of 5 (6 ratings)

More by Eliyahu M. Goldratt

Explore all 31 Eliyahu M. Goldratt quotes

More Decision making quotes

Browse all 4,902 Decision making quotes