Skip to content

About Quote by Chester Brown

“The main problem was a pacing problem. I had wanted the project to be about 20-30 issues, and I should have written it out as a full script beforehand.” quote by Chester Brown
Download Open image
“The main problem was a pacing problem. I had wanted the project to be about 20-30 issues, and I should have written it out as a full script beforehand.”

Chester Brown

About This Quote

Source Graphic Novel: My Last Days, 2002

Poor planning leads to pacing issues; script should be detailed before production

In simple terms: Lack of planning causes pacing problems

Key Takeaway

Plan thoroughly before execution

Themes

planning production pacing

Mood

analytical pragmatic

Type

instructional practical

When to use this quote

  • film making
  • software development
  • event planning
  • writing

Key Concepts

project management storytelling

Questions to Reflect On

  • How much detail is enough?
  • When should flexibility be allowed?
A Different Perspective

Over‑planning can stifle creativity

3.8 out of 5 (4 ratings)

More by Chester Brown

Explore all 61 Chester Brown quotes

More About quotes

Browse all 26,122 About quotes