Skip to content

The construction of permanent sea walls can be taken up…

“The construction of permanent sea walls can be taken up only in places where there is sea erosion due to heavy anthropogenic pressures. The locations for such non-living barriers should be determined on the basis of a carefully conducted erosion-vulnerability analysis.” quote by M. S. Swaminathan
Download Open image
“The construction of permanent sea walls can be taken up only in places where there is sea erosion due to heavy anthropogenic pressures. The locations for such non-living barriers should be determined on the basis of a carefully conducted erosion-vulnerability analysis.”

M. S. Swaminathan

About This Quote

This interpretation was drafted with AI assistance. It is one reading of the quote, not the author's own explanation.

Permanent sea walls should only be built where erosion is driven by human activity and after detailed vulnerability studies.

In simple terms: Build walls only where human‑caused erosion is proven.

Key Takeaway

Assess erosion before constructing barriers.

Themes

environment policy coastal management

Mood

cautious analytical

Type

policy technical

When to use this quote

  • coastal planning
  • infrastructure projects
  • environmental impact assessments

Key Concepts

anthropogenic pressure erosion vulnerability analysis

Questions to Reflect On

  • What data determines a site’s vulnerability?
  • How can nature‑based solutions complement walls?
A Different Perspective

Walls may give false security if underlying causes aren't addressed.

★ ★ ★ ★ ★ No ratings yet

More by M. S. Swaminathan

Explore all 80 M. S. Swaminathan quotes

More Barriers quotes

Browse all 1,191 Barriers quotes