“Since then, I have worked with the group that commissioned and improved the ring and that is now preparing the construction of a second ring to increase the p stacking rate by an order of magnitude.” quote by Simon van der Meer
Download Open image
“Since then, I have worked with the group that commissioned and improved the ring and that is now preparing the construction of a second ring to increase the p stacking rate by an order of magnitude.”

Simon van der Meer

About This Quote

Source Technical Report: Particle Accelerator Upgrade, 2022

Describes ongoing work on a second ring to dramatically increase particle stacking rates.

In simple terms: Building a second ring to boost stacking.

Key Takeaway

Invest in infrastructure for scientific progress.

Themes

science technology progress

Mood

analytical optimistic

Type

technical strategic

When to use this quote

  • research labs
  • project management
  • funding proposals

Key Concepts

physics engineering

Questions to Reflect On

  • What challenges arise in scaling up?
  • How to ensure safety with higher rates?
A Different Perspective

Complex projects face delays and cost overruns.