Skip to content

The first thing I have done for the Tejas is that their…

“The first thing I have done for the Tejas is that their capacity to annually produce eight aircraft has now been increased to 16. I have doubled it. For which we have given enough support, we have told them that if they need additional space for testing and trials, we are willing to give it.” quote by Nirmala Sitharaman
Download Open image
“The first thing I have done for the Tejas is that their capacity to annually produce eight aircraft has now been increased to 16. I have doubled it. For which we have given enough support, we have told them that if they need additional space for testing and trials, we are willing to give it.”

Nirmala Sitharaman

About This Quote

This interpretation was drafted with AI assistance. It is one reading of the quote, not the author's own explanation.

The Tejas aircraft production capacity was doubled from eight to sixteen annually, with added support for testing facilities.

In simple terms: Tejas production doubled to sixteen per year.

Key Takeaway

Invest in infrastructure to sustain growth.

Themes

defense industry capacity building

Mood

strategic forwardlooking

Type

policy military

When to use this quote

  • defense procurement
  • industrial policy
  • technology development

Key Concepts

Aerospace manufacturing strategic planning

Questions to Reflect On

  • What measures ensure quality at higher output?
  • How can testing facilities keep pace with production?
A Different Perspective

Scaling up may strain supply chains and workforce.

★ ★ ★ ★ ★ No ratings yet

More by Nirmala Sitharaman

Explore all 75 Nirmala Sitharaman quotes

More Enough quotes

Browse all 23,898 Enough quotes