Skip to content

The dollar is the final term in almost every equation…

“The dollar is the final term in almost every equation which arises in the practice of engineering in any or all of its branches, except qualifiedly as to military and naval engineering, where in some cases cost may be ignored.” quote by Henry R. Towne
Download Open image
“The dollar is the final term in almost every equation which arises in the practice of engineering in any or all of its branches, except qualifiedly as to military and naval engineering, where in some cases cost may be ignored.”

Henry R. Towne

About This Quote

This interpretation was drafted with AI assistance. It is one reading of the quote, not the author's own explanation.

Cost, especially monetary cost, dominates engineering decisions except in specific military contexts where other factors may outweigh it.

In simple terms: Cost drives engineering choices.

Key Takeaway

Consider cost in design decisions.

Themes

engineering economics decision making

Mood

analytical pragmatic

Type

advice technical

When to use this quote

  • product development
  • infrastructure projects
  • military design
  • resource allocation

Key Concepts

cost analysis budget constraints

Questions to Reflect On

  • How do you balance cost with other priorities?
  • When might you deliberately ignore cost?
A Different Perspective

Cost isn’t the only factor; safety, ethics, and performance also matter.

★ ★ ★ ★ ★ No ratings yet

More by Henry R. Towne

Explore all 5 Henry R. Towne quotes

More Arise quotes

Browse all 1,703 Arise quotes