---
title: "Meaning & Key Takeaway of: What was that?\" I ask as I blow through…"
description: "\"“What was that?\" I ask as I blow through. \"You were behind schedules,\" she says, panting but keeping pace next to me as we sprint down the pier. \"Figur..."
image: "https://sms4smile.com/quotes/i/76b/tera-lynn-childs-9922_blew_what-was-that-i-ask-as-i-blow-through-yo_2398000.jpg"
---

#  What was that?" I ask as I blow through. "You were behind…

![“What was that?&quot; I ask as I blow through. &quot;You were behind schedules,&quot; she says, panting but keeping pace next to me as we sprint down the pier. &quot;Figured you could use some help, so I blew the transformer.” quote by Tera Lynn Childs](https://sms4smile.com/quotes/i/76b/tera-lynn-childs-9922_blew_what-was-that-i-ask-as-i-blow-through-yo_2398000.jpg)   [Download](https://sms4smile.com/quotes/i/76b/tera-lynn-childs-9922_blew_what-was-that-i-ask-as-i-blow-through-yo_2398000.jpg) [Open image](https://sms4smile.com/quotes/i/76b/tera-lynn-childs-9922_blew_what-was-that-i-ask-as-i-blow-through-yo_2398000.jpg)

> ““What was that?" I ask as I blow through. "You were behind schedules," she says, panting but keeping pace next to me as we sprint down the pier. "Figured you could use some help, so I blew the transformer.””

[Tera Lynn Childs](https://sms4smile.com/quotes/author/tera-lynn-childs/)

## About This Quote

This interpretation was drafted with AI assistance. It is one reading of the quote, not the author's own explanation.

A character offers unexpected assistance, using a bold, unconventional method to help a teammate keep up.

**In simple terms:** Help can come in surprising forms, even risky ones.

Key Takeaway

Accept help, but assess risks.

Themes

teamwork risk support

Mood

tense determined

Type

narrative action

When to use this quote

- sports training
- emergency rescue
- collaborative projects

Key Concepts

unexpected assistance resourcefulness

Questions to Reflect On

- When is it worth taking a risky shortcut?
- How do you balance speed and safety?

A Different Perspective

The aid may cause unintended damage if not carefully considered.

★ ★ ★ ★ ★   No ratings yet

[Change](https://sms4smile.com/quotes/about/change/)

## Related quotes

> [I dont ask for a blow job because the word job makes it sound like its strenuous physical labor. Instead, I ask for mouth…](https://sms4smile.com/quotes/anonymous/i-dont-ask-for-a-blow-job-because-the-word-job-makes-it-sound-like/)

[Anonymous](https://sms4smile.com/quotes/author/anonymous/)

> [Rock and roll and swing never quite mixed. Rock and roll came in and just blew everything out of the water. Big bands were…](https://sms4smile.com/quotes/brian-setzer/rock-and-roll-and-swing-never-quite-mixed-rock-and-roll-came-in-and/)

[Brian Setzer](https://sms4smile.com/quotes/author/brian-setzer/)

> [Found my mind first time I blew a gram of tree.](https://sms4smile.com/quotes/sammy-adams/found-my-mind-first-time-i-blew-a-gram-of-tree/)

[Sammy Adams](https://sms4smile.com/quotes/author/sammy-adams/)

> [Ted Cruz new line of attack is that I've become establishment. Oh, give me a break. No, he's having a hard time. He had…](https://sms4smile.com/quotes/donald-trump/ted-cruz-new-line-of-attack-is-that-i-ve-become-establishment-oh-give/)

[Donald Trump](https://sms4smile.com/quotes/author/donald-trump/)

> [You know what, I distinctly remember my boat blew up and I was killed!](https://sms4smile.com/quotes/jeremy-clarkson/you-know-what-i-distinctly-remember-my-boat-blew-up-and-i-was-killed/)

[Jeremy Clarkson](https://sms4smile.com/quotes/author/jeremy-clarkson/)

> [“I came, I saw, I blew chunks.”](https://sms4smile.com/quotes/jeff-lindsay/i-came-i-saw-i-blew-chunks/)

[Jeff Lindsay](https://sms4smile.com/quotes/author/jeff-lindsay/)

> [It was a combination of typecasting and my own demons. There are roles I could have gotten, but there were just lots of opportunities…](https://sms4smile.com/quotes/david-faustino/it-was-a-combination-of-typecasting-and-my-own-demons-there-are-roles/)

[David Faustino](https://sms4smile.com/quotes/author/david-faustino/)

> [Just came home and made 200 grand blew it all in Waikiki. Just came home and made 200 grand blew it all with Luigi.](https://sms4smile.com/quotes/wiz-khalifa/just-came-home-and-made-200-grand-blew-it-all-in-waikiki-just-came/)

[Wiz Khalifa](https://sms4smile.com/quotes/author/wiz-khalifa/)

> [I didn't realize how many actresses have tons of extensions. Their hair is still pretty, but it blew my mind to find that out.…](https://sms4smile.com/quotes/shay-mitchell/i-didn-t-realize-how-many-actresses-have-tons-of-extensions-their/)

[Shay Mitchell](https://sms4smile.com/quotes/author/shay-mitchell/)

> [“Katniss blew it out, Peeta,”](https://sms4smile.com/quotes/suzanne-collins/katniss-blew-it-out-peeta/)

[Suzanne Collins](https://sms4smile.com/quotes/author/suzanne-collins/)

> [“Life blew in gusts from the hole in the side of the elephant with a rank smell and a comic flatulence.”](https://sms4smile.com/quotes/michael-chabon/life-blew-in-gusts-from-the-hole-in-the-side-of-the-elephant-with-a/)

[Michael Chabon](https://sms4smile.com/quotes/author/michael-chabon/)

> [Damn I really did it. I blew the first words on the moon, didn't I?](https://sms4smile.com/quotes/neil-armstrong/damn-i-really-did-it-i-blew-the-first-words-on-the-moon-didn-t-i/)

[Neil Armstrong](https://sms4smile.com/quotes/author/neil-armstrong/)

> [You switched the days," I said, dismayed. "You blew the tire. You..." I trailed off, probably because the next words out of my mouth…](https://sms4smile.com/quotes/ally-carter/you-switched-the-days-i-said-dismayed-you-blew-the-tire-you-i-trailed/)

[Ally Carter](https://sms4smile.com/quotes/author/ally-carter/)

> [After '8 Mile' came out and blew up, the ball has been rolling ever since.](https://sms4smile.com/quotes/omar-benson-miller/after-8-mile-came-out-and-blew-up-the-ball-has-been-rolling-ever-since/)

[Omar Benson Miller](https://sms4smile.com/quotes/author/omar-benson-miller/)

> [“I was ambitious and desperate to direct my first film, so I capitulated and blew it. Never again. Never fucking again.”](https://sms4smile.com/quotes/craig-ferguson/i-was-ambitious-and-desperate-to-direct-my-first-film-so-i/)

[Craig Ferguson](https://sms4smile.com/quotes/author/craig-ferguson/)

## More by Tera Lynn Childs

> [“Stupid male ego.”](https://sms4smile.com/quotes/tera-lynn-childs/stupid-male-ego/)

[Tera Lynn Childs](https://sms4smile.com/quotes/author/tera-lynn-childs/)

> [“I say it instead. "You told so," I admit. "You told me my image of Brody wasn't real, and you were right. I was…](https://sms4smile.com/quotes/tera-lynn-childs/i-say-it-instead-you-told-so-i-admit-you-told-me-my-image-of-brody/)

[Tera Lynn Childs](https://sms4smile.com/quotes/author/tera-lynn-childs/)

> [“You'll do fine." "What, you're psychic now?" "Didn't you know?" he asks seriously. "Must be an aftereffect of the bond.”](https://sms4smile.com/quotes/tera-lynn-childs/you-ll-do-fine-what-you-re-psychic-now-didn-t-you-know-he-asks/)

[Tera Lynn Childs](https://sms4smile.com/quotes/author/tera-lynn-childs/)

> [“Quince reaches me, and instead of wrapping me in a hug like I expect, he reaches for my hair. I try to swim back,…](https://sms4smile.com/quotes/tera-lynn-childs/quince-reaches-me-and-instead-of-wrapping-me-in-a-hug-like-i-expect/)

[Tera Lynn Childs](https://sms4smile.com/quotes/author/tera-lynn-childs/)

> [“You're not seriously going?" Troy asks. "Of course I'm going," I say. "What other choice do I have?" "Um...not going.”](https://sms4smile.com/quotes/tera-lynn-childs/you-re-not-seriously-going-troy-asks-of-course-i-m-going-i-say-what/)

[Tera Lynn Childs](https://sms4smile.com/quotes/author/tera-lynn-childs/)

> [“I know about love. U know about wanting and dreaming and wishing with every piece of your soul. I know enough to recognize the…](https://sms4smile.com/quotes/tera-lynn-childs/i-know-about-love-u-know-about-wanting-and-dreaming-and-wishing-with/)

[Tera Lynn Childs](https://sms4smile.com/quotes/author/tera-lynn-childs/)

> [“Some people find beauty in chaos.”](https://sms4smile.com/quotes/tera-lynn-childs/some-people-find-beauty-in-chaos/)

[Tera Lynn Childs](https://sms4smile.com/quotes/author/tera-lynn-childs/)

> [“Destiny is a gift, something to rise to. Fate is something to make for yourself.”](https://sms4smile.com/quotes/tera-lynn-childs/destiny-is-a-gift-something-to-rise-to-fate-is-something-to-make-for/)

[Tera Lynn Childs](https://sms4smile.com/quotes/author/tera-lynn-childs/)

> [“I'm going to teach you to ride Princess." "Princess?" "My motorcycle." I laugh. "You named your motorcycle Princess?" "What can I say?" he teases.…](https://sms4smile.com/quotes/tera-lynn-childs/i-m-going-to-teach-you-to-ride-princess-princess-my-motorcycle-i/)

[Tera Lynn Childs](https://sms4smile.com/quotes/author/tera-lynn-childs/)

> [“Sound doesn't carry as well through gills. You have to use a different level of your vocal chords." I point to the spot just…](https://sms4smile.com/quotes/tera-lynn-childs/sound-doesn-t-carry-as-well-through-gills-you-have-to-use-a-different/)

[Tera Lynn Childs](https://sms4smile.com/quotes/author/tera-lynn-childs/)

> [“Are you going to distract me by playing footsie?" "Absolutely, princess," he says with a wink. "Then I won't remember a thing." "It's a…](https://sms4smile.com/quotes/tera-lynn-childs/are-you-going-to-distract-me-by-playing-footsie-absolutely-princess/)

[Tera Lynn Childs](https://sms4smile.com/quotes/author/tera-lynn-childs/)

> [Admit it, He insists. I was right. No. I sniff. You were wrong. sniff. I'm just crying-sniff- cause I'm so happy. My tear take…](https://sms4smile.com/quotes/tera-lynn-childs/admit-it-he-insists-i-was-right-no-i-sniff-you-were-wrong-sniff-i-m/)

[Tera Lynn Childs](https://sms4smile.com/quotes/author/tera-lynn-childs/)

> [“He winks at me. Then, before Calliope can cheer my statement, or tell him to go, he says, "Lily has no sense of fashion."…](https://sms4smile.com/quotes/tera-lynn-childs/he-winks-at-me-then-before-calliope-can-cheer-my-statement-or-tell/)

[Tera Lynn Childs](https://sms4smile.com/quotes/author/tera-lynn-childs/)

> [“Pleased to meet you," Tellin says, shaking me out of my reverie. "Lily told me much about you last weekend." "Funny." Quince throws me…](https://sms4smile.com/quotes/tera-lynn-childs/pleased-to-meet-you-tellin-says-shaking-me-out-of-my-reverie-lily/)

[Tera Lynn Childs](https://sms4smile.com/quotes/author/tera-lynn-childs/)

> [“His hand cups the back of my neck, and before I can think, he dips down and our mouths meet. For a split second…](https://sms4smile.com/quotes/tera-lynn-childs/his-hand-cups-the-back-of-my-neck-and-before-i-can-think-he-dips-down/)

[Tera Lynn Childs](https://sms4smile.com/quotes/author/tera-lynn-childs/)

[Explore all 67 Tera Lynn Childs quotes ](https://sms4smile.com/quotes/author/tera-lynn-childs/)

## More Blew quotes

> [“I was ambitious and desperate to direct my first film, so I capitulated and blew it. Never again. Never fucking again.”](https://sms4smile.com/quotes/craig-ferguson/i-was-ambitious-and-desperate-to-direct-my-first-film-so-i/)

[Craig Ferguson](https://sms4smile.com/quotes/author/craig-ferguson/)

> [After '8 Mile' came out and blew up, the ball has been rolling ever since.](https://sms4smile.com/quotes/omar-benson-miller/after-8-mile-came-out-and-blew-up-the-ball-has-been-rolling-ever-since/)

[Omar Benson Miller](https://sms4smile.com/quotes/author/omar-benson-miller/)

> [You switched the days," I said, dismayed. "You blew the tire. You..." I trailed off, probably because the next words out of my mouth…](https://sms4smile.com/quotes/ally-carter/you-switched-the-days-i-said-dismayed-you-blew-the-tire-you-i-trailed/)

[Ally Carter](https://sms4smile.com/quotes/author/ally-carter/)

> [Damn I really did it. I blew the first words on the moon, didn't I?](https://sms4smile.com/quotes/neil-armstrong/damn-i-really-did-it-i-blew-the-first-words-on-the-moon-didn-t-i/)

[Neil Armstrong](https://sms4smile.com/quotes/author/neil-armstrong/)

> [“Life blew in gusts from the hole in the side of the elephant with a rank smell and a comic flatulence.”](https://sms4smile.com/quotes/michael-chabon/life-blew-in-gusts-from-the-hole-in-the-side-of-the-elephant-with-a/)

[Michael Chabon](https://sms4smile.com/quotes/author/michael-chabon/)

> [“Katniss blew it out, Peeta,”](https://sms4smile.com/quotes/suzanne-collins/katniss-blew-it-out-peeta/)

[Suzanne Collins](https://sms4smile.com/quotes/author/suzanne-collins/)

> [I didn't realize how many actresses have tons of extensions. Their hair is still pretty, but it blew my mind to find that out.…](https://sms4smile.com/quotes/shay-mitchell/i-didn-t-realize-how-many-actresses-have-tons-of-extensions-their/)

[Shay Mitchell](https://sms4smile.com/quotes/author/shay-mitchell/)

> [Just came home and made 200 grand blew it all in Waikiki. Just came home and made 200 grand blew it all with Luigi.](https://sms4smile.com/quotes/wiz-khalifa/just-came-home-and-made-200-grand-blew-it-all-in-waikiki-just-came/)

[Wiz Khalifa](https://sms4smile.com/quotes/author/wiz-khalifa/)

> [It was a combination of typecasting and my own demons. There are roles I could have gotten, but there were just lots of opportunities…](https://sms4smile.com/quotes/david-faustino/it-was-a-combination-of-typecasting-and-my-own-demons-there-are-roles/)

[David Faustino](https://sms4smile.com/quotes/author/david-faustino/)

> [“I came, I saw, I blew chunks.”](https://sms4smile.com/quotes/jeff-lindsay/i-came-i-saw-i-blew-chunks/)

[Jeff Lindsay](https://sms4smile.com/quotes/author/jeff-lindsay/)

> [You know what, I distinctly remember my boat blew up and I was killed!](https://sms4smile.com/quotes/jeremy-clarkson/you-know-what-i-distinctly-remember-my-boat-blew-up-and-i-was-killed/)

[Jeremy Clarkson](https://sms4smile.com/quotes/author/jeremy-clarkson/)

> [Ted Cruz new line of attack is that I've become establishment. Oh, give me a break. No, he's having a hard time. He had…](https://sms4smile.com/quotes/donald-trump/ted-cruz-new-line-of-attack-is-that-i-ve-become-establishment-oh-give/)

[Donald Trump](https://sms4smile.com/quotes/author/donald-trump/)

> [Found my mind first time I blew a gram of tree.](https://sms4smile.com/quotes/sammy-adams/found-my-mind-first-time-i-blew-a-gram-of-tree/)

[Sammy Adams](https://sms4smile.com/quotes/author/sammy-adams/)

> [Rock and roll and swing never quite mixed. Rock and roll came in and just blew everything out of the water. Big bands were…](https://sms4smile.com/quotes/brian-setzer/rock-and-roll-and-swing-never-quite-mixed-rock-and-roll-came-in-and/)

[Brian Setzer](https://sms4smile.com/quotes/author/brian-setzer/)

> [“You maniacs! You blew it all up! Goddam you all. Goddam you all to hell.”](https://sms4smile.com/quotes/george-taylor/you-maniacs-you-blew-it-all-up-goddam-you-all-goddam-you-all-to-hell/)

George Taylor

Browse all 156 Blew quotes

```json
{
    "@context": "https://schema.org",
    "@graph": [
        {
            "@type": "Quotation",
            "text": "“What was that?\" I ask as I blow through. \"You were behind schedules,\" she says, panting but keeping pace next to me as we sprint down the pier. \"Figured you could use some help, so I blew the transformer.”",
            "creator": {
                "@type": "Person",
                "name": "Tera Lynn Childs"
            },
            "isPartOf": {
                "@id": "https://sms4smile.com/quotes/#website"
            },
            "url": "https://sms4smile.com/quotes/tera-lynn-childs/what-was-that-i-ask-as-i-blow-through-you-were-behind-schedules-she/",
            "about": {
                "@type": "Thing",
                "name": "Blew"
            },
            "@id": "https://sms4smile.com/quotes/tera-lynn-childs/what-was-that-i-ask-as-i-blow-through-you-were-behind-schedules-she/#quotation",
            "image": {
                "@type": "ImageObject",
                "@id": "https://sms4smile.com/quotes/i/76b/tera-lynn-childs-9922_blew_what-was-that-i-ask-as-i-blow-through-yo_2398000.jpg",
                "contentUrl": "https://sms4smile.com/quotes/i/76b/tera-lynn-childs-9922_blew_what-was-that-i-ask-as-i-blow-through-yo_2398000.jpg",
                "url": "https://sms4smile.com/quotes/i/76b/tera-lynn-childs-9922_blew_what-was-that-i-ask-as-i-blow-through-yo_2398000.jpg",
                "width": 1080,
                "height": 1080,
                "caption": "“What was that?\" I ask as I blow through. \"You were behind schedules,\" she says, panting but keeping pace…” — Tera Lynn Childs",
                "creditText": "SMS4Smile Quotes",
                "creator": {
                    "@id": "https://sms4smile.com/quotes/#organization"
                }
            }
        },
        {
            "@type": "BreadcrumbList",
            "itemListElement": [
                {
                    "@type": "ListItem",
                    "position": 1,
                    "name": "Home",
                    "item": "https://sms4smile.com/"
                },
                {
                    "@type": "ListItem",
                    "position": 2,
                    "name": "Quotes",
                    "item": "https://sms4smile.com/quotes/"
                },
                {
                    "@type": "ListItem",
                    "position": 3,
                    "name": "Tera Lynn Childs",
                    "item": "https://sms4smile.com/quotes/author/tera-lynn-childs/"
                },
                {
                    "@type": "ListItem",
                    "position": 4,
                    "name": "“What was that?\" I ask as...",
                    "item": "https://sms4smile.com/quotes/tera-lynn-childs/what-was-that-i-ask-as-i-blow-through-you-were-behind-schedules-she/"
                }
            ],
            "@id": "https://sms4smile.com/quotes/tera-lynn-childs/what-was-that-i-ask-as-i-blow-through-you-were-behind-schedules-she/#breadcrumb"
        },
        {
            "@type": "WebSite",
            "@id": "https://sms4smile.com/quotes/#website",
            "name": "SMS4Smile Quotes",
            "url": "https://sms4smile.com/quotes/",
            "publisher": {
                "@id": "https://sms4smile.com/quotes/#organization"
            }
        },
        {
            "@type": "Organization",
            "@id": "https://sms4smile.com/quotes/#organization",
            "name": "SMS4Smile Quotes",
            "url": "https://sms4smile.com/quotes/",
            "logo": {
                "@type": "ImageObject",
                "url": "https://sms4smile.com/quotes/wp-content/themes/sq/assets/icons/icon-512.png",
                "width": 512,
                "height": 512
            }
        }
    ]
}
```
