---
title: "Meaning & Key Takeaway of: Hope is only an extension of time granted…"
description: "\"“Hope is only an extension of time granted to us until we decide to give up.”\" — Michael Mintz"
image: "https://sms4smile.com/quotes/i/391/michael-mintz-262831_decide_hope-is-only-an-extension-of-time-grante_2750121.jpg"
---

#  Hope is only an extension of time granted to us until we…

![“Hope is only an extension of time granted to us until we decide to give up.” quote by Michael Mintz](https://sms4smile.com/quotes/i/391/michael-mintz-262831_decide_hope-is-only-an-extension-of-time-grante_2750121.jpg)   [Download](https://sms4smile.com/quotes/i/391/michael-mintz-262831_decide_hope-is-only-an-extension-of-time-grante_2750121.jpg) [Open image](https://sms4smile.com/quotes/i/391/michael-mintz-262831_decide_hope-is-only-an-extension-of-time-grante_2750121.jpg)

> ““Hope is only an extension of time granted to us until we decide to give up.””

[Michael Mintz](https://sms4smile.com/quotes/author/michael-mintz/)

## About This Quote

This interpretation was drafted with AI assistance. It is one reading of the quote, not the author's own explanation.

Hope lasts until we quit; it’s a temporary extension of time granted to us.

**In simple terms:** Hope persists until you give up.

Key Takeaway

Persist before hope fades.

Themes

hope perseverance time motivation resilience

Mood

encouraging reflective

Type

decide:1 granted:1 hope:1 time:1 hope extension:1 time granted:1 granted decide:0

When to use this quote

- personal setbacks
- career challenges
- health journeys

Key Concepts

temporal psychology psychological endurance goal setting

Questions to Reflect On

- When does hope become untenable?
- How can we sustain hope in adversity?

A Different Perspective

May overlook external constraints on hope.

★ ★ ★ ★ ★   No ratings yet

[Decide](https://sms4smile.com/quotes/about/decide/) [Granted](https://sms4smile.com/quotes/about/granted/) [Granted Decide](https://sms4smile.com/quotes/about/granted-decide-3093702/) [Hope](https://sms4smile.com/quotes/about/hope/) [Hope Extension](https://sms4smile.com/quotes/about/hope-extension-3093700/) [Time](https://sms4smile.com/quotes/about/time/) [Time Granted](https://sms4smile.com/quotes/about/time-granted-3093701/)

## Related quotes

> [Time granted does not necessarily coincide with time that can be most fully used.](https://sms4smile.com/quotes/tillie-olsen/time-granted-does-not-necessarily-coincide-with-time-that-can-be-most/)

[Tillie Olsen](https://sms4smile.com/quotes/author/tillie-olsen/)

> [Dont take time for granted. Its limited. Truly try to take in the best from every moment.](https://sms4smile.com/quotes/anonymous/dont-take-time-for-granted-its-limited-truly-try-to-take-in-the-best/)

[Anonymous](https://sms4smile.com/quotes/author/anonymous/)

> [What you believe in, is the life you decide.](https://sms4smile.com/quotes/keshia-chante/what-you-believe-in-is-the-life-you-decide/)

[Keshia Chante](https://sms4smile.com/quotes/author/keshia-chante/)

> [It’s as easy as we choose to make it,” he murmured, pressing his forehead to mine. “At least, this decision is. Nothing’s truly easy,…](https://sms4smile.com/quotes/richelle-mead/it-s-as-easy-as-we-choose-to-make-it-he-murmured-pressing-his/)

[Richelle Mead](https://sms4smile.com/quotes/author/richelle-mead/)

> [We cant choose our lives, but we can decide what to do with the joys or griefs were given.](https://sms4smile.com/quotes/paulo-coelho/we-cant-choose-our-lives-but-we-can-decide-what-to-do-with-the-joys/)

[Paulo Coelho](https://sms4smile.com/quotes/author/paulo-coelho/)

> [Fear is going to be a player in your life, but you get to decide how much!](https://sms4smile.com/quotes/jim-carrey/fear-is-going-to-be-a-player-in-your-life-but-you-get-to-decide-how/)

[Jim Carrey](https://sms4smile.com/quotes/author/jim-carrey/)

> [All the people ought to decide, but now most states are tossed on the scrap heap and ignored](https://sms4smile.com/quotes/john-anderson/all-the-people-ought-to-decide-but-now-most-states-are-tossed-on-the/)

[John Anderson](https://sms4smile.com/quotes/author/john-anderson/)

> [“Do you keep pace with those around you, or do you decide yourself just how you will live your life? The truth is...only you…](https://sms4smile.com/quotes/steve-goodier/do-you-keep-pace-with-those-around-you-or-do-you-decide-yourself-just/)

[Steve Goodier](https://sms4smile.com/quotes/author/steve-goodier/)

> [Decisions decide destiny, there is no action without decision](https://sms4smile.com/quotes/tony-robbins/decisions-decide-destiny-there-is-no-action-without-decision/)

[Tony Robbins](https://sms4smile.com/quotes/author/tony-robbins/)

> [LOOK before you pick,DECIDE WELL before you choose,because these two things are very important in life.](https://sms4smile.com/quotes/oluwatayo-oluwatoyosi/look-before-you-pick-decide-well-before-you-choose-because-these-two/)

[Oluwatayo Oluwatoyosi](https://sms4smile.com/quotes/author/oluwatayo-oluwatoyosi/)

> [Nothing is more private than a woman's body; it is her physical, emotional, and moral citadel. She cannot be free at all if she…](https://sms4smile.com/quotes/lewis-b-smedes/nothing-is-more-private-than-a-woman-s-body-it-is-her-physical/)

[Lewis B. Smedes](https://sms4smile.com/quotes/author/lewis-b-smedes/)

> [In New York, you are constantly faced with this very urgent decision that you have to make, about every twenty minutes...you have to decide,…](https://sms4smile.com/quotes/david-cross/in-new-york-you-are-constantly-faced-with-this-very-urgent-decision/)

[David Cross](https://sms4smile.com/quotes/author/david-cross/)

> [We do not know which irresponsible Israeli prime minister will take office and decide to use nuclear weapons in the struggle against neighboring Arab…](https://sms4smile.com/quotes/mordechai-vanunu/we-do-not-know-which-irresponsible-israeli-prime-minister-will-take/)

[Mordechai Vanunu](https://sms4smile.com/quotes/author/mordechai-vanunu/)

> [DECIDE, v.i. To succumb to the preponderance of one set of influences over another set.](https://sms4smile.com/quotes/ambrose-bierce/decide-v-i-to-succumb-to-the-preponderance-of-one-set-of-influences/)

[Ambrose Bierce](https://sms4smile.com/quotes/author/ambrose-bierce/)

> [“Exactly. So, what can't you take? Decide which of the two options is harder, and do the other. That way, no matter how hard…](https://sms4smile.com/quotes/josephine-angelini/exactly-so-what-can-t-you-take-decide-which-of-the-two-options-is/)

[Josephine Angelini](https://sms4smile.com/quotes/author/josephine-angelini/)

## More Decide quotes

> [“Exactly. So, what can't you take? Decide which of the two options is harder, and do the other. That way, no matter how hard…](https://sms4smile.com/quotes/josephine-angelini/exactly-so-what-can-t-you-take-decide-which-of-the-two-options-is/)

[Josephine Angelini](https://sms4smile.com/quotes/author/josephine-angelini/)

> [DECIDE, v.i. To succumb to the preponderance of one set of influences over another set.](https://sms4smile.com/quotes/ambrose-bierce/decide-v-i-to-succumb-to-the-preponderance-of-one-set-of-influences/)

[Ambrose Bierce](https://sms4smile.com/quotes/author/ambrose-bierce/)

> [We do not know which irresponsible Israeli prime minister will take office and decide to use nuclear weapons in the struggle against neighboring Arab…](https://sms4smile.com/quotes/mordechai-vanunu/we-do-not-know-which-irresponsible-israeli-prime-minister-will-take/)

[Mordechai Vanunu](https://sms4smile.com/quotes/author/mordechai-vanunu/)

> [In New York, you are constantly faced with this very urgent decision that you have to make, about every twenty minutes...you have to decide,…](https://sms4smile.com/quotes/david-cross/in-new-york-you-are-constantly-faced-with-this-very-urgent-decision/)

[David Cross](https://sms4smile.com/quotes/author/david-cross/)

> [Nothing is more private than a woman's body; it is her physical, emotional, and moral citadel. She cannot be free at all if she…](https://sms4smile.com/quotes/lewis-b-smedes/nothing-is-more-private-than-a-woman-s-body-it-is-her-physical/)

[Lewis B. Smedes](https://sms4smile.com/quotes/author/lewis-b-smedes/)

> [LOOK before you pick,DECIDE WELL before you choose,because these two things are very important in life.](https://sms4smile.com/quotes/oluwatayo-oluwatoyosi/look-before-you-pick-decide-well-before-you-choose-because-these-two/)

[Oluwatayo Oluwatoyosi](https://sms4smile.com/quotes/author/oluwatayo-oluwatoyosi/)

> [Decisions decide destiny, there is no action without decision](https://sms4smile.com/quotes/tony-robbins/decisions-decide-destiny-there-is-no-action-without-decision/)

[Tony Robbins](https://sms4smile.com/quotes/author/tony-robbins/)

> [“Do you keep pace with those around you, or do you decide yourself just how you will live your life? The truth is...only you…](https://sms4smile.com/quotes/steve-goodier/do-you-keep-pace-with-those-around-you-or-do-you-decide-yourself-just/)

[Steve Goodier](https://sms4smile.com/quotes/author/steve-goodier/)

> [All the people ought to decide, but now most states are tossed on the scrap heap and ignored](https://sms4smile.com/quotes/john-anderson/all-the-people-ought-to-decide-but-now-most-states-are-tossed-on-the/)

[John Anderson](https://sms4smile.com/quotes/author/john-anderson/)

> [Fear is going to be a player in your life, but you get to decide how much!](https://sms4smile.com/quotes/jim-carrey/fear-is-going-to-be-a-player-in-your-life-but-you-get-to-decide-how/)

[Jim Carrey](https://sms4smile.com/quotes/author/jim-carrey/)

> [We cant choose our lives, but we can decide what to do with the joys or griefs were given.](https://sms4smile.com/quotes/paulo-coelho/we-cant-choose-our-lives-but-we-can-decide-what-to-do-with-the-joys/)

[Paulo Coelho](https://sms4smile.com/quotes/author/paulo-coelho/)

> [It’s as easy as we choose to make it,” he murmured, pressing his forehead to mine. “At least, this decision is. Nothing’s truly easy,…](https://sms4smile.com/quotes/richelle-mead/it-s-as-easy-as-we-choose-to-make-it-he-murmured-pressing-his/)

[Richelle Mead](https://sms4smile.com/quotes/author/richelle-mead/)

> [What you believe in, is the life you decide.](https://sms4smile.com/quotes/keshia-chante/what-you-believe-in-is-the-life-you-decide/)

[Keshia Chante](https://sms4smile.com/quotes/author/keshia-chante/)

> [Heart is decide u want in ur life](https://sms4smile.com/quotes/raajni/heart-is-decide-u-want-in-ur-life/)

[Raajni](https://sms4smile.com/quotes/author/raajni/)

> [I think hopefully we've got enough brain cells left to decide if our music is really worth something.](https://sms4smile.com/quotes/will-champion/i-think-hopefully-we-ve-got-enough-brain-cells-left-to-decide-if-our/)

[Will Champion](https://sms4smile.com/quotes/author/will-champion/)

[Browse all 1,644 Decide quotes ](https://sms4smile.com/quotes/about/decide/)

```json
{
    "@context": "https://schema.org",
    "@graph": [
        {
            "@type": "Quotation",
            "text": "“Hope is only an extension of time granted to us until we decide to give up.”",
            "creator": {
                "@type": "Person",
                "name": "Michael Mintz"
            },
            "isPartOf": {
                "@id": "https://sms4smile.com/quotes/#website"
            },
            "url": "https://sms4smile.com/quotes/michael-mintz/hope-is-only-an-extension-of-time-granted-to-us-until-we-decide-to/",
            "about": {
                "@type": "Thing",
                "name": "Decide"
            },
            "@id": "https://sms4smile.com/quotes/michael-mintz/hope-is-only-an-extension-of-time-granted-to-us-until-we-decide-to/#quotation",
            "image": {
                "@type": "ImageObject",
                "@id": "https://sms4smile.com/quotes/i/391/michael-mintz-262831_decide_hope-is-only-an-extension-of-time-grante_2750121.jpg",
                "contentUrl": "https://sms4smile.com/quotes/i/391/michael-mintz-262831_decide_hope-is-only-an-extension-of-time-grante_2750121.jpg",
                "url": "https://sms4smile.com/quotes/i/391/michael-mintz-262831_decide_hope-is-only-an-extension-of-time-grante_2750121.jpg",
                "width": 1080,
                "height": 1080,
                "caption": "“Hope is only an extension of time granted to us until we decide to give up.” — Michael Mintz",
                "creditText": "SMS4Smile Quotes",
                "creator": {
                    "@id": "https://sms4smile.com/quotes/#organization"
                }
            }
        },
        {
            "@type": "BreadcrumbList",
            "itemListElement": [
                {
                    "@type": "ListItem",
                    "position": 1,
                    "name": "Home",
                    "item": "https://sms4smile.com/"
                },
                {
                    "@type": "ListItem",
                    "position": 2,
                    "name": "Quotes",
                    "item": "https://sms4smile.com/quotes/"
                },
                {
                    "@type": "ListItem",
                    "position": 3,
                    "name": "Michael Mintz",
                    "item": "https://sms4smile.com/quotes/author/michael-mintz/"
                },
                {
                    "@type": "ListItem",
                    "position": 4,
                    "name": "“Hope is only an extension of...",
                    "item": "https://sms4smile.com/quotes/michael-mintz/hope-is-only-an-extension-of-time-granted-to-us-until-we-decide-to/"
                }
            ],
            "@id": "https://sms4smile.com/quotes/michael-mintz/hope-is-only-an-extension-of-time-granted-to-us-until-we-decide-to/#breadcrumb"
        },
        {
            "@type": "WebSite",
            "@id": "https://sms4smile.com/quotes/#website",
            "name": "SMS4Smile Quotes",
            "url": "https://sms4smile.com/quotes/",
            "publisher": {
                "@id": "https://sms4smile.com/quotes/#organization"
            }
        },
        {
            "@type": "Organization",
            "@id": "https://sms4smile.com/quotes/#organization",
            "name": "SMS4Smile Quotes",
            "url": "https://sms4smile.com/quotes/",
            "logo": {
                "@type": "ImageObject",
                "url": "https://sms4smile.com/quotes/wp-content/themes/sq/assets/icons/icon-512.png",
                "width": 512,
                "height": 512
            }
        }
    ]
}
```
