---
title: "Meaning & Key Takeaway of: We've been running a little behind…"
description: "\"We've been running a little behind schedule. But only by about 15 years or so.\" — Matt Groening"
image: "https://sms4smile.com/quotes/i/187/matt-groening-1946_running_we-ve-been-running-a-little-behind-sched_719226.png"
---

#  We've been running a little behind schedule. But only by…

![“We've been running a little behind schedule. But only by about 15 years or so.” quote by Matt Groening](https://sms4smile.com/quotes/i/187/matt-groening-1946_running_we-ve-been-running-a-little-behind-sched_719226.png)   [Download](https://sms4smile.com/quotes/i/187/matt-groening-1946_running_we-ve-been-running-a-little-behind-sched_719226.png) [Open image](https://sms4smile.com/quotes/i/187/matt-groening-1946_running_we-ve-been-running-a-little-behind-sched_719226.png)

> “We've been running a little behind schedule. But only by about 15 years or so.”

[Matt Groening](https://sms4smile.com/quotes/author/matt-groening/)

## About This Quote

This interpretation was drafted with AI assistance. It is one reading of the quote, not the author's own explanation.

A humorous acknowledgment that society’s progress is lagging behind expectations.

**In simple terms:** We’re far behind schedule.

Key Takeaway

Recognize and address delays.

Themes

progress technology optimism

Mood

wry reflective

Type

humorous satirical

When to use this quote

- urban development
- climate policy
- technology adoption

Key Concepts

societal lag future planning

Questions to Reflect On

- What areas are we underestimating?
- How can we accelerate progress?

A Different Perspective

Progress may be slower than hoped, requiring patience.

★ ★ ★ ★ ★   No ratings yet

[Running](https://sms4smile.com/quotes/about/running/)

## Related quotes

> [If I didn't have my little schedule book, I wouldn't get out of bed in the morning.](https://sms4smile.com/quotes/robert-osborne/if-i-didn-t-have-my-little-schedule-book-i-wouldn-t-get-out-of-bed-in/)

[Robert Osborne](https://sms4smile.com/quotes/author/robert-osborne/)

> [I'm very organized. I have my day-to-day schedule, every 15 minutes, written out.](https://sms4smile.com/quotes/christen-press/i-m-very-organized-i-have-my-day-to-day-schedule-every-15-minutes/)

[Christen Press](https://sms4smile.com/quotes/author/christen-press/)

> [“It's time you stop running, little Loner.”](https://sms4smile.com/quotes/skye-callahan/it-s-time-you-stop-running-little-loner/)

[Skye Callahan](https://sms4smile.com/quotes/author/skye-callahan/)

> [When I was growing up, I was running around; I was a little tomboy. So I was just running around trying to be an…](https://sms4smile.com/quotes/dania-ramirez/when-i-was-growing-up-i-was-running-around-i-was-a-little-tomboy-so-i/)

[Dania Ramirez](https://sms4smile.com/quotes/author/dania-ramirez/)

> [I feel like every running back should have their own little stamp on the game.](https://sms4smile.com/quotes/arian-foster/i-feel-like-every-running-back-should-have-their-own-little-stamp-on/)

[Arian Foster](https://sms4smile.com/quotes/author/arian-foster/)

> [I have been running on little sleep, grief, energy drinks, coffee AND being a mother and wife the past week. I'm fed up.](https://sms4smile.com/quotes/anonymous/i-have-been-running-on-little-sleep-grief-energy-drinks-coffee-and/)

[Anonymous](https://sms4smile.com/quotes/author/anonymous/)

> [I've been running my whole life. Running into bars, running around the world. But when you have a child, you can't run. That was…](https://sms4smile.com/quotes/craig-ferguson/i-ve-been-running-my-whole-life-running-into-bars-running-around-the/)

[Craig Ferguson](https://sms4smile.com/quotes/author/craig-ferguson/)

> [“If all you do is run every time, stop for a minute and take a glance at your back; you may have an idea…](https://sms4smile.com/quotes/eve-lee-myself/if-all-you-do-is-run-every-time-stop-for-a-minute-and-take-a-glance/)

Eve Lee myself

> [I've done enough running from monsters. It's time to do some chasing.](https://sms4smile.com/quotes/noah-schnapp/i-ve-done-enough-running-from-monsters-it-s-time-to-do-some-chasing/)

[Noah Schnapp](https://sms4smile.com/quotes/author/noah-schnapp/)

> [Don't you know that I've been running from your heart.](https://sms4smile.com/quotes/skin/don-t-you-know-that-i-ve-been-running-from-your-heart/)

[Skin](https://sms4smile.com/quotes/author/skin/)

> [I feel like you've been running too.](https://sms4smile.com/quotes/skin/i-feel-like-you-ve-been-running-too/)

[Skin](https://sms4smile.com/quotes/author/skin/)

> [The last five or six days, I've been running. The last two days, I've been running pretty hard. Everybody's got to be someplace.](https://sms4smile.com/quotes/bill-russell/the-last-five-or-six-days-i-ve-been-running-the-last-two-days-i-ve/)

[Bill Russell](https://sms4smile.com/quotes/author/bill-russell/)

> [“You've been running like the little Apollyon Energizer Bunny.”](https://sms4smile.com/quotes/jennifer-l-armentrout/you-ve-been-running-like-the-little-apollyon-energizer-bunny/)

[Jennifer L. Armentrout](https://sms4smile.com/quotes/author/jennifer-l-armentrout/)

> [I've been running from, and toward, death all my life, more aware of it than a person should be.](https://sms4smile.com/quotes/ridley-pearson/i-ve-been-running-from-and-toward-death-all-my-life-more-aware-of-it/)

[Ridley Pearson](https://sms4smile.com/quotes/author/ridley-pearson/)

> [I've been running a lot, taking care of myself.](https://sms4smile.com/quotes/eminem/i-ve-been-running-a-lot-taking-care-of-myself/)

[Eminem](https://sms4smile.com/quotes/author/eminem/)

## More by Matt Groening

> [You just have to keep in mind that the important relationship is the relationship with the audience. That's what I try to do. Everything…](https://sms4smile.com/quotes/matt-groening/you-just-have-to-keep-in-mind-that-the-important-relationship-is-the/)

[Matt Groening](https://sms4smile.com/quotes/author/matt-groening/)

> [Do my worst, eh? Smithers, release the robotic Richard Simmons." --Mr. Burns](https://sms4smile.com/quotes/matt-groening/do-my-worst-eh-smithers-release-the-robotic-richard-simmons-mr-burns/)

[Matt Groening](https://sms4smile.com/quotes/author/matt-groening/)

> [I draw a weekly comic strip called Life in Hell, which is syndicated in about 250 newspapers. That's what I did before The Simpsons,…](https://sms4smile.com/quotes/matt-groening/i-draw-a-weekly-comic-strip-called-life-in-hell-which-is-syndicated/)

[Matt Groening](https://sms4smile.com/quotes/author/matt-groening/)

> [We've got a bunch of new writers now who tell me they grew up watching The Simpsons. It's bizarre, and they're writing some very…](https://sms4smile.com/quotes/matt-groening/we-ve-got-a-bunch-of-new-writers-now-who-tell-me-they-grew-up/)

[Matt Groening](https://sms4smile.com/quotes/author/matt-groening/)

> [When authorities warn you of the sinfulness of sex, there is an important lesson to be learned. Do not have sex with the authorities.](https://sms4smile.com/quotes/matt-groening/when-authorities-warn-you-of-the-sinfulness-of-sex-there-is-an/)

[Matt Groening](https://sms4smile.com/quotes/author/matt-groening/)

> [I was always frightened by taverns. They just seemed like very unpleasant places to go.](https://sms4smile.com/quotes/matt-groening/i-was-always-frightened-by-taverns-they-just-seemed-like-very/)

[Matt Groening](https://sms4smile.com/quotes/author/matt-groening/)

> [There's always room out there for the hand-drawn image. I personally like the imperfection of hand drawing as opposed to the slick look of…](https://sms4smile.com/quotes/matt-groening/there-s-always-room-out-there-for-the-hand-drawn-image-i-personally/)

[Matt Groening](https://sms4smile.com/quotes/author/matt-groening/)

> [People go into cartooning because they're shy and they're angry. That's when you're sitting in the back of a classroom drawing the teacher.](https://sms4smile.com/quotes/matt-groening/people-go-into-cartooning-because-they-re-shy-and-they-re-angry-that/)

[Matt Groening](https://sms4smile.com/quotes/author/matt-groening/)

> [Keep your expectations tiny you'll go through life not so whiney.](https://sms4smile.com/quotes/matt-groening/keep-your-expectations-tiny-you-ll-go-through-life-not-so-whiney/)

[Matt Groening](https://sms4smile.com/quotes/author/matt-groening/)

> [Cartooning is for people who can't quite draw and can't quite write. You combine the two half-talents and come up with a career.](https://sms4smile.com/quotes/matt-groening/cartooning-is-for-people-who-can-t-quite-draw-and-can-t-quite-write/)

[Matt Groening](https://sms4smile.com/quotes/author/matt-groening/)

> [On 'The Simpsons,' I will say that we definitely like to comment on what's going on in the world, and we try to be…](https://sms4smile.com/quotes/matt-groening/on-the-simpsons-i-will-say-that-we-definitely-like-to-comment-on-what/)

[Matt Groening](https://sms4smile.com/quotes/author/matt-groening/)

> [First you get the sugar, then you get the power, then you get the women.](https://sms4smile.com/quotes/matt-groening/first-you-get-the-sugar-then-you-get-the-power-then-you-get-the-women/)

[Matt Groening](https://sms4smile.com/quotes/author/matt-groening/)

> [The tendency in comedy is to have a character who's stupid get more stupid, because you're trying to top yourself and not just repeat.](https://sms4smile.com/quotes/matt-groening/the-tendency-in-comedy-is-to-have-a-character-who-s-stupid-get-more/)

[Matt Groening](https://sms4smile.com/quotes/author/matt-groening/)

> ['The Simpsons' from the very beginning was based on our memories of brash '60s sitcoms - you had a main title theme that was…](https://sms4smile.com/quotes/matt-groening/the-simpsons-from-the-very-beginning-was-based-on-our-memories-of/)

[Matt Groening](https://sms4smile.com/quotes/author/matt-groening/)

> [The conundrum that I face on a daily basis is that I have two sons who have grown up watching 'The Simpsons,' so they…](https://sms4smile.com/quotes/matt-groening/the-conundrum-that-i-face-on-a-daily-basis-is-that-i-have-two-sons/)

[Matt Groening](https://sms4smile.com/quotes/author/matt-groening/)

[Explore all 195 Matt Groening quotes ](https://sms4smile.com/quotes/author/matt-groening/)

## More Running quotes

> [The costs of the Bush-Obama wars in Iraq and Afghanistan are now estimated to run as high as $4.4 trillion - a major victory…](https://sms4smile.com/quotes/noam-chomsky/the-costs-of-the-bush-obama-wars-in-iraq-and-afghanistan-are-now/)

[Noam Chomsky](https://sms4smile.com/quotes/author/noam-chomsky/)

> [I just think that things should be allowed to run their course, and not turned into a Disney ride.](https://sms4smile.com/quotes/fiona-shaw/i-just-think-that-things-should-be-allowed-to-run-their-course-and/)

[Fiona Shaw](https://sms4smile.com/quotes/author/fiona-shaw/)

> [It can sometimes make people fold into themselves and kind of run away, but I think in this case these characters are being forced…](https://sms4smile.com/quotes/emily-deschanel/it-can-sometimes-make-people-fold-into-themselves-and-kind-of-run/)

[Emily Deschanel](https://sms4smile.com/quotes/author/emily-deschanel/)

> [When you're in the middle of a pennant race, you can't go up there thinking about home runs.](https://sms4smile.com/quotes/sammy-sosa/when-you-re-in-the-middle-of-a-pennant-race-you-can-t-go-up-there/)

[Sammy Sosa](https://sms4smile.com/quotes/author/sammy-sosa/)

> [Certainly, it is. Love is love, and loss is loss. We all love, and we all die, and everyone suffers the pain of grieving.…](https://sms4smile.com/quotes/lynsay-sands/certainly-it-is-love-is-love-and-loss-is-loss-we-all-love-and-we-all/)

[Lynsay Sands](https://sms4smile.com/quotes/author/lynsay-sands/)

> [She'd read once that if you ran into a bear in the woods you should avoid eye contact and you shouldn't run away, but…](https://sms4smile.com/quotes/anne-ursu/she-d-read-once-that-if-you-ran-into-a-bear-in-the-woods-you-should/)

[Anne Ursu](https://sms4smile.com/quotes/author/anne-ursu/)

> [The world's history is a divine poem, of which the history of every nation is a canto, and every man a word. Its strains…](https://sms4smile.com/quotes/james-a-garfield/the-world-s-history-is-a-divine-poem-of-which-the-history-of-every/)

[James A. Garfield](https://sms4smile.com/quotes/author/james-a-garfield/)

> [Well, my wife, Cathy Gillespie, worked for Joe Barton, who was running for Congress in 1984.](https://sms4smile.com/quotes/ed-gillespie/well-my-wife-cathy-gillespie-worked-for-joe-barton-who-was-running/)

[Ed Gillespie](https://sms4smile.com/quotes/author/ed-gillespie/)

> [I'd noticed him watching me for a year or so, especially when we'd play games where there was running or jumping.](https://sms4smile.com/quotes/jesse-owens/i-d-noticed-him-watching-me-for-a-year-or-so-especially-when-we-d/)

[Jesse Owens](https://sms4smile.com/quotes/author/jesse-owens/)

> [We were so poor as kids. I didn't even see a bathtub, running water, hot water, commode - we didn't have any of that.…](https://sms4smile.com/quotes/phil-robertson/we-were-so-poor-as-kids-i-didn-t-even-see-a-bathtub-running-water-hot/)

[Phil Robertson](https://sms4smile.com/quotes/author/phil-robertson/)

> [I think the people I talk about are generally so stupid that they don't even know I'm saying bad things about them. I've run…](https://sms4smile.com/quotes/chelsea-handler/i-think-the-people-i-talk-about-are-generally-so-stupid-that-they-don/)

[Chelsea Handler](https://sms4smile.com/quotes/author/chelsea-handler/)

> [I knew I really had to put down a good run. I played it safe, and took risks when I could, and I came…](https://sms4smile.com/quotes/julia-mancuso/i-knew-i-really-had-to-put-down-a-good-run-i-played-it-safe-and-took/)

[Julia Mancuso](https://sms4smile.com/quotes/author/julia-mancuso/)

> [There's more than 1700 emails out of the thirty three thousand Hillary Clinton emails that we've published, just about Libya. It's not that Libya…](https://sms4smile.com/quotes/julian-assange/there-s-more-than-1700-emails-out-of-the-thirty-three-thousand/)

[Julian Assange](https://sms4smile.com/quotes/author/julian-assange/)

> [I've seen every one, from Motley Crue to John Denver, with tears running down my face. I had no idea everyone had such a…](https://sms4smile.com/quotes/stevie-nicks/i-ve-seen-every-one-from-motley-crue-to-john-denver-with-tears/)

[Stevie Nicks](https://sms4smile.com/quotes/author/stevie-nicks/)

> [The rich people are apparently leaving America. They're giving up their citizenship. These great lovers of America who made their money in this country-when…](https://sms4smile.com/quotes/bernie-sanders/the-rich-people-are-apparently-leaving-america-they-re-giving-up/)

[Bernie Sanders](https://sms4smile.com/quotes/author/bernie-sanders/)

[Browse all 16,025 Running quotes ](https://sms4smile.com/quotes/about/running/)

```json
{
    "@context": "https://schema.org",
    "@graph": [
        {
            "@type": "Quotation",
            "text": "We've been running a little behind schedule. But only by about 15 years or so.",
            "creator": {
                "@type": "Person",
                "name": "Matt Groening"
            },
            "isPartOf": {
                "@id": "https://sms4smile.com/quotes/#website"
            },
            "url": "https://sms4smile.com/quotes/matt-groening/we-ve-been-running-a-little-behind-schedule-but-only-by-about-15/",
            "about": {
                "@type": "Thing",
                "name": "Running"
            },
            "@id": "https://sms4smile.com/quotes/matt-groening/we-ve-been-running-a-little-behind-schedule-but-only-by-about-15/#quotation",
            "image": {
                "@type": "ImageObject",
                "@id": "https://sms4smile.com/quotes/i/187/matt-groening-1946_running_we-ve-been-running-a-little-behind-sched_719226.png",
                "contentUrl": "https://sms4smile.com/quotes/i/187/matt-groening-1946_running_we-ve-been-running-a-little-behind-sched_719226.png",
                "url": "https://sms4smile.com/quotes/i/187/matt-groening-1946_running_we-ve-been-running-a-little-behind-sched_719226.png",
                "width": 1080,
                "height": 1080,
                "caption": "“We've been running a little behind schedule. But only by about 15 years or so.” — Matt Groening",
                "creditText": "SMS4Smile Quotes",
                "creator": {
                    "@id": "https://sms4smile.com/quotes/#organization"
                }
            }
        },
        {
            "@type": "BreadcrumbList",
            "itemListElement": [
                {
                    "@type": "ListItem",
                    "position": 1,
                    "name": "Home",
                    "item": "https://sms4smile.com/"
                },
                {
                    "@type": "ListItem",
                    "position": 2,
                    "name": "Quotes",
                    "item": "https://sms4smile.com/quotes/"
                },
                {
                    "@type": "ListItem",
                    "position": 3,
                    "name": "Matt Groening",
                    "item": "https://sms4smile.com/quotes/author/matt-groening/"
                },
                {
                    "@type": "ListItem",
                    "position": 4,
                    "name": "We've been running a little behind...",
                    "item": "https://sms4smile.com/quotes/matt-groening/we-ve-been-running-a-little-behind-schedule-but-only-by-about-15/"
                }
            ],
            "@id": "https://sms4smile.com/quotes/matt-groening/we-ve-been-running-a-little-behind-schedule-but-only-by-about-15/#breadcrumb"
        },
        {
            "@type": "WebSite",
            "@id": "https://sms4smile.com/quotes/#website",
            "name": "SMS4Smile Quotes",
            "url": "https://sms4smile.com/quotes/",
            "publisher": {
                "@id": "https://sms4smile.com/quotes/#organization"
            }
        },
        {
            "@type": "Organization",
            "@id": "https://sms4smile.com/quotes/#organization",
            "name": "SMS4Smile Quotes",
            "url": "https://sms4smile.com/quotes/",
            "logo": {
                "@type": "ImageObject",
                "url": "https://sms4smile.com/quotes/wp-content/themes/sq/assets/icons/icon-512.png",
                "width": 512,
                "height": 512
            }
        }
    ]
}
```
