---
title: "Meaning & Key Takeaway of: Cost overruns are not uncommon in…"
description: "\"Cost overruns are not uncommon in architecture, particularly for designs that depart from structural or technological norms, or demand a finer quality ..."
image: "https://sms4smile.com/quotes/i/c09/martin-filler-11342_architect_cost-overruns-are-not-uncommon-in-archit_946906.png"
---

#  Cost overruns are not uncommon in architecture…

![“Cost overruns are not uncommon in architecture, particularly for designs that depart from structural or technological norms, or demand a finer quality of execution than commercial schemes - conditions typical of buildings for cultural institutions. Budgets are exceeded for many reasons, not all of…” quote by Martin Filler](https://sms4smile.com/quotes/i/c09/martin-filler-11342_architect_cost-overruns-are-not-uncommon-in-archit_946906.png)   [Download](https://sms4smile.com/quotes/i/c09/martin-filler-11342_architect_cost-overruns-are-not-uncommon-in-archit_946906.png) [Open image](https://sms4smile.com/quotes/i/c09/martin-filler-11342_architect_cost-overruns-are-not-uncommon-in-archit_946906.png)

> “Cost overruns are not uncommon in architecture, particularly for designs that depart from structural or technological norms, or demand a finer quality of execution than commercial schemes - conditions typical of buildings for cultural institutions. Budgets are exceeded for many reasons, not all of them within an architect's control.”

[Martin Filler](https://sms4smile.com/quotes/author/martin-filler/)

## About This Quote

This interpretation was drafted with AI assistance. It is one reading of the quote, not the author's own explanation.

Cost overruns happen often when designs are unconventional or require high craftsmanship, and many factors lie beyond the architect's control.

**In simple terms:** Unusual designs and high quality often cause budget overruns.

Key Takeaway

Plan for contingencies and manage expectations.

Themes

budget architecture risk quality control

Mood

cautious realistic

Type

analytical practical

When to use this quote

- cultural institution projects
- high‑tech buildings
- renovations
- public works

Key Concepts

project management design complexity stakeholder expectations

Questions to Reflect On

- How can contracts allocate risk for unforeseen issues?
- What budgeting tools help track scope changes?

A Different Perspective

Even with careful planning, unexpected site conditions can still drive up costs.

★ ★ ★ ★ ★   No ratings yet

[Architect](https://sms4smile.com/quotes/about/architect/) [Architecture](https://sms4smile.com/quotes/about/architecture/) [Budgets](https://sms4smile.com/quotes/about/budgets/) [Budgets Exceeded](https://sms4smile.com/quotes/about/budgets-exceeded-1659715/) [Building](https://sms4smile.com/quotes/about/building/) [Conditions](https://sms4smile.com/quotes/about/conditions/) [Cost](https://sms4smile.com/quotes/about/cost/) [Cost Overruns](https://sms4smile.com/quotes/about/cost-overruns-1659713/) [Demand](https://sms4smile.com/quotes/about/demand/) [Design](https://sms4smile.com/quotes/about/design/) [Execution](https://sms4smile.com/quotes/about/execution/) [Institutions](https://sms4smile.com/quotes/about/institutions/) [Norm](https://sms4smile.com/quotes/about/norm/) [Overruns Uncommon](https://sms4smile.com/quotes/about/overruns-uncommon-1659717/) [Quality](https://sms4smile.com/quotes/about/quality/) [Reason](https://sms4smile.com/quotes/about/reason/) [Reasons Architect](https://sms4smile.com/quotes/about/reasons-architect-1659714/) [Schemes](https://sms4smile.com/quotes/about/schemes/) [Technological](https://sms4smile.com/quotes/about/technological/) [Typical](https://sms4smile.com/quotes/about/typical/) [Uncommon](https://sms4smile.com/quotes/about/uncommon/) [Uncommon Architecture](https://sms4smile.com/quotes/about/uncommon-architecture-1659716/)

## Related quotes

> [The best way to create cost overruns in any military acquisition is to change course midstream. That is exactly what Donald Trump wants to…](https://sms4smile.com/quotes/p-w-singer/the-best-way-to-create-cost-overruns-in-any-military-acquisition-is/)

[P. W. Singer](https://sms4smile.com/quotes/author/p-w-singer/)

> [The science of the church is neglected for the study of geometry, and they lose sight of Heaven while they are employed in measuring…](https://sms4smile.com/quotes/edward-gibbon/the-science-of-the-church-is-neglected-for-the-study-of-geometry-and/)

[Edward Gibbon](https://sms4smile.com/quotes/author/edward-gibbon/)

> [Excellence is to do a common thing in an uncommon way.](https://sms4smile.com/quotes/booker-t-washington/excellence-is-to-do-a-common-thing-in-an-uncommon-way/)

[Booker T. Washington](https://sms4smile.com/quotes/author/booker-t-washington/)

> [I turned what was a wonderful case of self-reliance into a case of self-exile. Which is not uncommon, I think, in people who grow…](https://sms4smile.com/quotes/leigh-newman/i-turned-what-was-a-wonderful-case-of-self-reliance-into-a-case-of/)

[Leigh Newman](https://sms4smile.com/quotes/author/leigh-newman/)

> [Hannah Tinti writes with uncommon grace and stunning insight. Her quirky tribe of outcasts will break into your dreams and steal your spirit. Surrender…](https://sms4smile.com/quotes/melanie-rae-thon/hannah-tinti-writes-with-uncommon-grace-and-stunning-insight-her/)

[Melanie Rae Thon](https://sms4smile.com/quotes/author/melanie-rae-thon/)

> [By their victory, the 3rd, 4th and 5th Marine Divisions and other units of the Fifth Amphibious Corps have made an accounting to their…](https://sms4smile.com/quotes/chester-w-nimitz/by-their-victory-the-3rd-4th-and-5th-marine-divisions-and-other-units/)

[Chester W. Nimitz](https://sms4smile.com/quotes/author/chester-w-nimitz/)

> [You know, I want to be the uncommon one. I think it's pretty cool that I'm only 5'11", you know, and playing in the…](https://sms4smile.com/quotes/russell-wilson/you-know-i-want-to-be-the-uncommon-one-i-think-it-s-pretty-cool-that/)

[Russell Wilson](https://sms4smile.com/quotes/author/russell-wilson/)

> [No one got rich on a government program. Do not choose to be a common man. You can be uncommon.](https://sms4smile.com/quotes/dave-ramsey/no-one-got-rich-on-a-government-program-do-not-choose-to-be-a-common/)

[Dave Ramsey](https://sms4smile.com/quotes/author/dave-ramsey/)

> [Do you think I'm wonderful? she asked him one day as they leaned against the trunk of a petrified maple. No, he said. Why?…](https://sms4smile.com/quotes/jonathan-safran-foer/do-you-think-i-m-wonderful-she-asked-him-one-day-as-they-leaned/)

[Jonathan Safran Foer](https://sms4smile.com/quotes/author/jonathan-safran-foer/)

> [I believe in the goodness of man, and I believe we're all connected and that connection is through God. We have our differences. But…](https://sms4smile.com/quotes/corbin-bernsen/i-believe-in-the-goodness-of-man-and-i-believe-we-re-all-connected/)

[Corbin Bernsen](https://sms4smile.com/quotes/author/corbin-bernsen/)

> [Common sense is very uncommon.](https://sms4smile.com/quotes/horace-greeley/common-sense-is-very-uncommon/)

[Horace Greeley](https://sms4smile.com/quotes/author/horace-greeley/)

> [Adventure is the invitation to common people to become uncommon.](https://sms4smile.com/quotes/warren-miller/adventure-is-the-invitation-to-common-people-to-become-uncommon/)

[Warren Miller](https://sms4smile.com/quotes/author/warren-miller/)

> [But when we're helping children understand how people from different walks of life can coexist, prioritizing common ground too often obscures or erases uncommon…](https://sms4smile.com/quotes/meena-harris/but-when-we-re-helping-children-understand-how-people-from-different/)

[Meena Harris](https://sms4smile.com/quotes/author/meena-harris/)

> [In the ring, there's not a lot of room for mistakes. You're in a place that is chaos, that is on fire. That ring…](https://sms4smile.com/quotes/teddy-atlas/in-the-ring-there-s-not-a-lot-of-room-for-mistakes-you-re-in-a-place/)

[Teddy Atlas](https://sms4smile.com/quotes/author/teddy-atlas/)

> [Bruce Katz is a spectacular talent! He's a brilliant composer and arranger who uses uncommon and unique musical intelligence to redefine jazz and blues…](https://sms4smile.com/quotes/larry-coryell/bruce-katz-is-a-spectacular-talent-he-s-a-brilliant-composer-and/)

[Larry Coryell](https://sms4smile.com/quotes/author/larry-coryell/)

## More by Martin Filler

> [Elevated locations imply elevated purposes, even in American cities departing as radically as Los Angeles does from the traditional planning patterns of the Eastern…](https://sms4smile.com/quotes/martin-filler/elevated-locations-imply-elevated-purposes-even-in-american-cities/)

[Martin Filler](https://sms4smile.com/quotes/author/martin-filler/)

> [Architecture is not a profession for the faint-hearted, the weak-willed, or the short-lived.](https://sms4smile.com/quotes/martin-filler/architecture-is-not-a-profession-for-the-faint-hearted-the-weak/)

[Martin Filler](https://sms4smile.com/quotes/author/martin-filler/)

> [The danger for any artist whose work is both recognizable and critically acclaimed is complacent repetition - the temptation to churn out easily identifiable,…](https://sms4smile.com/quotes/martin-filler/the-danger-for-any-artist-whose-work-is-both-recognizable-and/)

[Martin Filler](https://sms4smile.com/quotes/author/martin-filler/)

> [Architectural kitsch is most common in the commercial pop vernacular - typified by the Big Duck of 1931 in Flanders, New York, a Long…](https://sms4smile.com/quotes/martin-filler/architectural-kitsch-is-most-common-in-the-commercial-pop-vernacular/)

[Martin Filler](https://sms4smile.com/quotes/author/martin-filler/)

> [The Frankfurt Museum of Decorative Arts is a handsome building, which takes its cues from the riverside Biedermeier villa next to it, and it…](https://sms4smile.com/quotes/martin-filler/the-frankfurt-museum-of-decorative-arts-is-a-handsome-building-which/)

[Martin Filler](https://sms4smile.com/quotes/author/martin-filler/)

> [The most basic task of any museum must be the protection of works of cultural significance entrusted to its care for the edification and…](https://sms4smile.com/quotes/martin-filler/the-most-basic-task-of-any-museum-must-be-the-protection-of-works-of/)

[Martin Filler](https://sms4smile.com/quotes/author/martin-filler/)

> [Postmodernism came nowhere close in quality to Modernism at its apogee, not least because that later style wholly lacked the social impetus that animated…](https://sms4smile.com/quotes/martin-filler/postmodernism-came-nowhere-close-in-quality-to-modernism-at-its/)

[Martin Filler](https://sms4smile.com/quotes/author/martin-filler/)

> [One reason I've never been a fan of graphic novels is because a central aspect of literature for me has always been imagining what…](https://sms4smile.com/quotes/martin-filler/one-reason-i-ve-never-been-a-fan-of-graphic-novels-is-because-a/)

[Martin Filler](https://sms4smile.com/quotes/author/martin-filler/)

> [The truth be told, the World Trade Center was neither a very good work of architecture nor a very successful piece of urbanism. Its…](https://sms4smile.com/quotes/martin-filler/the-truth-be-told-the-world-trade-center-was-neither-a-very-good-work/)

[Martin Filler](https://sms4smile.com/quotes/author/martin-filler/)

> [During the modern period, the vanguard architect has usually relied on small residential jobs both to supply a steady income and to serve as…](https://sms4smile.com/quotes/martin-filler/during-the-modern-period-the-vanguard-architect-has-usually-relied-on/)

[Martin Filler](https://sms4smile.com/quotes/author/martin-filler/)

> [We take from the art of the past what we need. The variable posthumous reputations of even the greatest artists and the unpredictable revivals…](https://sms4smile.com/quotes/martin-filler/we-take-from-the-art-of-the-past-what-we-need-the-variable-posthumous/)

[Martin Filler](https://sms4smile.com/quotes/author/martin-filler/)

> [Masterpieces of art possess immense potential to advance a worldview that could help assuage the societal terrors posed by globalization, the most thoroughgoing socioeconomic…](https://sms4smile.com/quotes/martin-filler/masterpieces-of-art-possess-immense-potential-to-advance-a-worldview/)

[Martin Filler](https://sms4smile.com/quotes/author/martin-filler/)

> [The work that launched Snohetta into the architectural big leagues was their Oslo Opera House, which will certainly rank among the firm's highlights whatever…](https://sms4smile.com/quotes/martin-filler/the-work-that-launched-snohetta-into-the-architectural-big-leagues/)

[Martin Filler](https://sms4smile.com/quotes/author/martin-filler/)

> [There can be little question that the tall building presents one of the most difficult challenges to the architect.](https://sms4smile.com/quotes/martin-filler/there-can-be-little-question-that-the-tall-building-presents-one-of/)

[Martin Filler](https://sms4smile.com/quotes/author/martin-filler/)

> [The first half of the 1960s was the apogee of what might be termed the Age of Cool - as defined by that quality…](https://sms4smile.com/quotes/martin-filler/the-first-half-of-the-1960s-was-the-apogee-of-what-might-be-termed/)

[Martin Filler](https://sms4smile.com/quotes/author/martin-filler/)

[Explore all 60 Martin Filler quotes ](https://sms4smile.com/quotes/author/martin-filler/)

## More Architect quotes

> [When I am asked what I believe in, I say that I believe in architecture. Architecture is the mother of the arts. I like…](https://sms4smile.com/quotes/richard-meier/when-i-am-asked-what-i-believe-in-i-say-that-i-believe-in/)

[Richard Meier](https://sms4smile.com/quotes/author/richard-meier/)

> [Some architects have a preconceived notion of what a building should be](https://sms4smile.com/quotes/curtis-w-fentress/some-architects-have-a-preconceived-notion-of-what-a-building-should/)

[Curtis W. Fentress](https://sms4smile.com/quotes/author/curtis-w-fentress/)

> [Whether that's speaking up in your job or asking for a promotion or saying, 'I think I can do that.' Using your voice in…](https://sms4smile.com/quotes/maria-shriver/whether-that-s-speaking-up-in-your-job-or-asking-for-a-promotion-or/)

[Maria Shriver](https://sms4smile.com/quotes/author/maria-shriver/)

> [When it comes to getting things done, we need fewer architects and more bricklayers.](https://sms4smile.com/quotes/anonymous/when-it-comes-to-getting-things-done-we-need-fewer-architects-and/)

[Anonymous](https://sms4smile.com/quotes/author/anonymous/)

> [Architects mostly work for privileged people, people who have money and power, Power and money are invisible, so people hire us to visualize their…](https://sms4smile.com/quotes/shigeru-ban/architects-mostly-work-for-privileged-people-people-who-have-money/)

[Shigeru Ban](https://sms4smile.com/quotes/author/shigeru-ban/)

> [I was the chairman of the Budget Committee and the lead architect the last time it happened in Washington, and when we did it…](https://sms4smile.com/quotes/john-kasich/i-was-the-chairman-of-the-budget-committee-and-the-lead-architect-the/)

[John Kasich](https://sms4smile.com/quotes/author/john-kasich/)

> [The architect is very interesting because the architect is the commander, meaning the one who commands all the workers. The architect is also the…](https://sms4smile.com/quotes/santiago-calatrava/the-architect-is-very-interesting-because-the-architect-is-the/)

[Santiago Calatrava](https://sms4smile.com/quotes/author/santiago-calatrava/)

> [The pursuit of peace resembles the building of a great cathedral. It is the work of a generation. In concept it requires a mater-architect;…](https://sms4smile.com/quotes/hubert-h-humphrey/the-pursuit-of-peace-resembles-the-building-of-a-great-cathedral-it/)

[Hubert H. Humphrey](https://sms4smile.com/quotes/author/hubert-h-humphrey/)

> [Yes, Garnett Grey was an Architect. Were a psychoanalyst to approach him from behind, tap his shoulder, and say 'Humanity,' Garrett'd spin and respond,…](https://sms4smile.com/quotes/chip-kidd/yes-garnett-grey-was-an-architect-were-a-psychoanalyst-to-approach/)

[Chip Kidd](https://sms4smile.com/quotes/author/chip-kidd/)

> [The challenge of today's generation of architects is the environment.](https://sms4smile.com/quotes/carol-ross-barney/the-challenge-of-today-s-generation-of-architects-is-the-environment/)

[Carol Ross Barney](https://sms4smile.com/quotes/author/carol-ross-barney/)

> [I stand on this rostrum with a sense of deep humility and great pride - humility in the weight of those great American architects…](https://sms4smile.com/quotes/douglas-macarthur/i-stand-on-this-rostrum-with-a-sense-of-deep-humility-and-great-pride/)

[Douglas MacArthur](https://sms4smile.com/quotes/author/douglas-macarthur/)

> [Architects in the past have tended to concentrate their attention on the building as a static object. I believe dynamics are more important: the…](https://sms4smile.com/quotes/anonymous/architects-in-the-past-have-tended-to-concentrate-their-attention-on/)

[Anonymous](https://sms4smile.com/quotes/author/anonymous/)

> [I was the chairman of the House Budget Committee and one of the chief architects the last time we balanced a budget, and it…](https://sms4smile.com/quotes/john-kasich/i-was-the-chairman-of-the-house-budget-committee-and-one-of-the-chief/)

[John Kasich](https://sms4smile.com/quotes/author/john-kasich/)

> [No matter what an architect may be at home, he becomes a monumentalist when he comes to Washington.](https://sms4smile.com/quotes/ada-louise-huxtable/no-matter-what-an-architect-may-be-at-home-he-becomes-a-monumentalist/)

[Ada Louise Huxtable](https://sms4smile.com/quotes/author/ada-louise-huxtable/)

> [As an architect you design for the present, with an awareness of the past, for a future which is essentially unknown.](https://sms4smile.com/quotes/norman-foster/as-an-architect-you-design-for-the-present-with-an-awareness-of-the/)

[Norman Foster](https://sms4smile.com/quotes/author/norman-foster/)

[Browse all 836 Architect quotes ](https://sms4smile.com/quotes/about/architect/)

```json
{
    "@context": "https://schema.org",
    "@graph": [
        {
            "@type": "Quotation",
            "text": "Cost overruns are not uncommon in architecture, particularly for designs that depart from structural or technological norms, or demand a finer quality of execution than commercial schemes - conditions typical of buildings for cultural institutions. Budgets are exceeded for many reasons, not all of them within an architect's control.",
            "creator": {
                "@type": "Person",
                "name": "Martin Filler"
            },
            "isPartOf": {
                "@id": "https://sms4smile.com/quotes/#website"
            },
            "url": "https://sms4smile.com/quotes/martin-filler/cost-overruns-are-not-uncommon-in-architecture-particularly-for/",
            "about": {
                "@type": "Thing",
                "name": "Architect"
            },
            "@id": "https://sms4smile.com/quotes/martin-filler/cost-overruns-are-not-uncommon-in-architecture-particularly-for/#quotation",
            "image": {
                "@type": "ImageObject",
                "@id": "https://sms4smile.com/quotes/i/c09/martin-filler-11342_architect_cost-overruns-are-not-uncommon-in-archit_946906.png",
                "contentUrl": "https://sms4smile.com/quotes/i/c09/martin-filler-11342_architect_cost-overruns-are-not-uncommon-in-archit_946906.png",
                "url": "https://sms4smile.com/quotes/i/c09/martin-filler-11342_architect_cost-overruns-are-not-uncommon-in-archit_946906.png",
                "width": 1080,
                "height": 1080,
                "caption": "“Cost overruns are not uncommon in architecture, particularly for designs that depart from structural or…” — Martin Filler",
                "creditText": "SMS4Smile Quotes",
                "creator": {
                    "@id": "https://sms4smile.com/quotes/#organization"
                }
            }
        },
        {
            "@type": "BreadcrumbList",
            "itemListElement": [
                {
                    "@type": "ListItem",
                    "position": 1,
                    "name": "Home",
                    "item": "https://sms4smile.com/"
                },
                {
                    "@type": "ListItem",
                    "position": 2,
                    "name": "Quotes",
                    "item": "https://sms4smile.com/quotes/"
                },
                {
                    "@type": "ListItem",
                    "position": 3,
                    "name": "Martin Filler",
                    "item": "https://sms4smile.com/quotes/author/martin-filler/"
                },
                {
                    "@type": "ListItem",
                    "position": 4,
                    "name": "Cost overruns are not uncommon in...",
                    "item": "https://sms4smile.com/quotes/martin-filler/cost-overruns-are-not-uncommon-in-architecture-particularly-for/"
                }
            ],
            "@id": "https://sms4smile.com/quotes/martin-filler/cost-overruns-are-not-uncommon-in-architecture-particularly-for/#breadcrumb"
        },
        {
            "@type": "WebSite",
            "@id": "https://sms4smile.com/quotes/#website",
            "name": "SMS4Smile Quotes",
            "url": "https://sms4smile.com/quotes/",
            "publisher": {
                "@id": "https://sms4smile.com/quotes/#organization"
            }
        },
        {
            "@type": "Organization",
            "@id": "https://sms4smile.com/quotes/#organization",
            "name": "SMS4Smile Quotes",
            "url": "https://sms4smile.com/quotes/",
            "logo": {
                "@type": "ImageObject",
                "url": "https://sms4smile.com/quotes/wp-content/themes/sq/assets/icons/icon-512.png",
                "width": 512,
                "height": 512
            }
        }
    ]
}
```
